[Home ]   [ فارسی ]  
Main Menu
SRE::
Railway Academy::
Education::
Research::
People::
Facilities::
News::
Subset::
Admission::
Contact us::
::
9th International Conference
..
Search in website

Advanced Search
..
Polling
How do you evaluate this site?
Excellent
Good
Average
Poor
   
..
About Iran

AWT IMAGE

..
:: Izadkhast Bridge ::
 | Post date: 2016/10/31 | 

- Bridge monitoring (Izadkhast Bridge)

- Monitoring of Veresk Bridge

- Switch Monitoring

View: 2116 Time(s)   |   Print: 857 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)
>
:: 21-06-2016 ::
 | Post date: 2016/09/17 | 

Completed bridge load test projects are as following

1-Bridge-monitoring-Veresk

2-Pad-influence-bridge461

3-Switch-monitoring-Yatri

View: 2150 Time(s)   |   Print: 1040 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)
>
:: The Test Tove and 1035 Bridge ::
 | Post date: 2016/04/27 | 

1- Structural Health Monitoring and Dynamic Load Testing of Tove Bridge

2- Structural Health Monitoring and Dynamic Load Testing of 1035 bridge

View: 2440 Time(s)   |   Print: 1231 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)
>
:: the bridge test ::
 | Post date: 2016/01/27 | 

Completed bridge load test projects are as following:

1-Neka Bridge Load test- as Built Dimension

2- Neka Bridge Load Test-Framework Mounting

3- Neka Bridge Load Test-Accelerometer Installation

4- Neka Bridge Load Test-LVDT Installation

5- Neka Bridge Load Test-Straingauge Installation

 6- Neka Bridge Load Test-Data Logger Setting

7- Neka Bridge Load Test-Sensor Calibration

View: 2602 Time(s)   |   Print: 1229 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)
>
:: bridge load test-1 ::
 | Post date: 2016/01/26 | 

Completed bridge load test projects are as following:

1-Bridge-Load Test-Ghotour

2-Bridge-Load Test-Km475

3-Bridge-Load Test-Km487

4-Bridge-Load Test-Km564

5-Bridge-Load Test-S

6-Bridge-Load Test-Shahbazan

View: 2081 Time(s)   |   Print: 734 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)
>
:: Bridge Load Test ::
 | Post date: 2015/07/12 | 

Completed bridge load test projects are as following:

  • Ghalemorghi Bridge Load Test

  • Ghotour Bridge Load Test

         2- Neka Bridge Load Test-Framework Mounting

         3- Neka Bridge Load Test-Accelerometer Installation

         4- Neka Bridge Load Test-LVDT Installation

         5- Neka Bridge Load Test-Straingauge Installation

         6- Neka Bridge Load Test-Data Logger Setting

         7- Neka Bridge Load Test-Sensor Calibration

         8- Neka Bridge Load Test-Surveying

         9- Neka Bridge Load Test-Static Load Test

         10- Neka Bridge Load Test-Dynamic Load Test

         11- Neka Bridge Load Test-Impact Test

View: 2803 Time(s)   |   Print: 906 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)
>
:: Other articles: ::
:: the bridge test - -
:: bridge load test-1 - -
:: Bridge Load Test - -
کلیه حقوق مادی و معنوی این سایت متعلق به دانشکده مهندسی راه آهن دانشگاه علم و صنعت ایران می باشد. استفاده از مطالب آن با ذکر منبع بلامانع می باشد.
Persian site map - English site map - Created in 0.19 seconds with 81 queries by YEKTAWEB 4665