Search published articles


Showing 7 results for Hua

Y.y. Chang, C.j. Lee, W.c. Huang, W.j. Huang, M.l. Lin, W.y. Hung, Y. H. Lin,
Volume 11, Issue 2 (Transaction B: Geotechnical Engineering 2013)
Abstract

This study presents a series of physical model tests and numerical simulations using PFC2D (both with a dip slip angle=60° and

a soil bed thickness of 0.2 m in model scale)at the acceleration conditions of 1g, 40g, and 80 g to model reverse faulting. The soil

deposits in prototype scale have thicknesses of 0.2 m, 8 m, and 16 m, respectively. This study also investigates the evolution of a

surface deformation profile and the propagation of subsurface rupture traces through overlying sand. This study proposes a

methodology for calibrating the micromechanical material parameters used in the numerical simulation based on the measured

surface settlements of the tested sand bed in the self-weight consolidation stage. The test results show that steeper surface slope

on the surface deformation profile, a wider shear band on the major faulting-induced distortion zone, and more faulting appeared

in the shallower depths in the 1-g reverse faulting model test than in the tests involving higher-g levels. The surface deformation

profile measured from the higher-g physical modeling and that calculated from numerical modeling show good agreement. The

width of the shear band obtained from the numerical simulation was slightly wider than that from the physical modeling at the

same g-levels and the position of the shear band moved an offset of 15 mm in model scale to the footwall compared with the results

of physical modeling.


K. J. Tu, Y. W. Huang,
Volume 11, Issue 4 (Transaction A: December 2013)
Abstract

The decisions made in the planning phase of a building project greatly affect its future operation and maintenance (O&M) cost. Recognizing the O&M cost of condominiums’ common facilities as a critical issue for home owners, this research aims to develop an artificial neural network (ANN) O&M cost prediction model to assist developers and architects in effectively assessing the impacts of their decisions made in the planning phase of condominium projects on future O&M costs. A regression cost prediction model was also developed as a benchmark model for testing the predictive accuracy of the ANN model. Six critical building design attributes (building age, number of apartment units, number of floors, average sale price, total floor area, and common facility floor area) which are usually available in the project planning phase, were identified as the input factors to both models and average monthly O&M cost as the output factor. 55 of the 65 existing condominium properties randomly selected were treated as the training samples whose data were used to develop the ANN and regression models the other ten as the test samples to compare and verify the predictive performance of both models. The study results revealed that the ANN model delivers more accurate and reliable cost prediction results, with lower average absolute error around 7.2% and maximum absolute error around 16.7%, as compared with the regression model. This study shows that ANN is an effective method in predicting building O&M costs in the project planning phase. Keywords: Project management, Facility management, Common facilities, Cost modeling.
Wen-Chao Huang,
Volume 12, Issue 3 (Transaction B: Geotechnical Engineering, July 2014)
Abstract

When geogrid reinforcement is used as a treatment method for improving soft subgrade as a roadway foundation, a top layer of subgrade is usually excavated and backfilled with geogrid-reinforced aggregates. This treatment method produces an adequate platform for the planned roadway construction site, where heavy traffic loading is constantly moving. This paper presents a quantitative assessment of subgrade improvement by geogrid reinforcement based on numerical modelling and parametric studies. First of all, the preliminary numerical models were verified by comparing the analysis results with previous studies. Secondly, the major numerical models in this study were assumed to be a simplified simulation of a geogrid-reinforced two-layer system with an aggregate layer above a subgrade layer. The numerical models were applied a quasi-static loading and unloading cycle, in order to monitor the permanent deformation at the surface of the models. Afterwards, thickness of aggregate layer, and subgrade CBR values were varied in order to summarize the outcomes of each case. This approach makes it possible to quantify the effects of geogrid reinforcement and aggregate material in terms of an enhanced California Bearing Ratio (CBR) of a single subgrade clay layer. Results have shown that when the aggregate thickness is up to 450mm, the contribution of enhanced CBR is mostly from aggregate material. However, when the aggregate thickness is about 150mm with a relatively weak subgrade material, the inclusion of geogrid material can contribute about 50% of the enhanced value.
X. Liu, K. Sheng, J.h. Hua, B.n. Hong, J.j. Zhu,
Volume 13, Issue 3 (Transaction B: Geotechnical Engineering 2015)
Abstract

In order to improve the utilization of high liquid limit soil, the fundamental properties of high liquid limit soil and its direct utilization method are studied in this paper. This work involves both laboratory and fieldwork experiments. The results show that clay and sandy clay both with high liquid limit can be directly used for the road embankment, and the degree of compaction can be controlled at 88 %. The pack-and-cover method in accordance with Chinese technical specifications is recommended to be operated in the engineering practice. The packed height should be less than 8 meters and the total height of embankment no more than 12 meters in the interests of settlement. From the view of stability, the optimal thickness value of top sealing soil layer and edge sealing soil layer is about 1.5 meter respectively, and the geogrid reinforcement spacing should be about 2.0 meters. In addition, based on Yun-Luo expressway in China filled with high liquid limit soil, the construction techniques and key points of quality control in subgrade with pack-and-cover method are compared and discussed in detail, and the feasibility of these schemes are verified by the experimental results.


Shuai Li, Jian-Min Zhang, Wei-Lin Xu, Jian-Gang Chen, Yong Peng, Jun-Ning Li, Xiao-Long He,
Volume 14, Issue 1 (Transaction A: Civil Engineering 2016)
Abstract

The cavitation erosion induced by high flow velocities is very prominent in high head and large unit discharge tunnel. Air entrainment is an effective technology to solve this problem. In this study, numerical simulation and physical model test are applied to the comparative study of air-water flows on bottom and lateral aerator in tunnel. The flow pattern, aeration cavity, air concentration and pressure distribution were obtained and there is a close agreement between the numerical and physical model values. The hydraulic characteristic and aeration effect of anti-arc section are analyzed. The results indicated that added lateral aeration facilities on 1# and 2# aerator can weaken backwater and increase the length of the bottom cavity, but it is limited to improve the air concentration and protect sidewall downstream of the ogee section. Air concentration improved on side walls downstream of anti-arc section when added lateral aeration facility on 3# aerator. The black water triangle zone disappeared and the floor and side walls well protected.


Jiuping Xu, Qiurui Liu, Zhonghua Yang,
Volume 15, Issue 1 (Transaction A: Civil Engineering 2017)
Abstract

To fully explain hydropower unit operational problems, an optimal multi-objective dynamic scheduling model is presented which seeks to improve the efficiency of reservation regulation management. To reflect the actual hydropower engineering project environment, fuzzy random uncertainty and an integrated consideration of the natural resource constraints, such as load balance, system power balance, generation limits, turbine capacity, water head, discharge capacities, reservoir storage volumes, and water spillages, were included in the model. The aim of this research was to concurrently minimize discharges and maximize economic benefit. Subsequently, a new hybrid dynamic-programming based multi-start multi-objective simulated annealing algorithm was developed to solve the hydro unit operational problem. The proposed model and intelligent algorithm were then applied to the Xiaolongmen Hydraulic and Hydropower Station in China. The computational unit commitment schedule results demonstrated the practicality and efficiency of this optimization method.


Tao Ma, Hao Wang, Yongli Zhao, Xiaoming Huang, Siqi Wang,
Volume 15, Issue 2 (Transaction A: Civil Engineering 2017)
Abstract

This study evaluated the effects of Warm Mix Asphalt (WMA) additives on the compaction temperature and properties of Crumb Rubber Modified (CRM) asphalt binder and mixture. Two different WMA additives (named as Sas and Evm) were used to prepare warm-mix CRM asphalt binder and mixture. The viscosity of different warm-mix CRM asphalt binders and mastics were measured at different temperatures. The rheological and mechanical properties of different warm-mix CRM asphalt binders were tested. At the mixture level, the volumetric properties of different warm-mix CRM asphalt mixtures were experimented by Gyratory compactor at different temperatures and the performance of different warm-mix CRM asphalt mixtures were evaluated. It was found that, both of the two WMA additives could lower the compaction temperatures of CRM asphalt mixtures by 10°C~20°C. However, they have different influences on rheological properties of CRM binder and performance of CRM mixture. The Sas warm-mix additive can improve the anti-rutting performance of CRM mixture but may degrade its low-temperature performance and moisture stability. The Evm warm-mix additive has no adverse effects on the high-temperature and low-temperature performance of CRM asphalt mixtures and can improve its moisture stability.



Page 1 from 1     

© 2024 CC BY-NC 4.0 | International Journal of Civil Engineering

Designed & Developed by : Yektaweb