Volume 19, Issue 5 (IJES 2008)                   IJIEPR 2008, 19(5): 1-13 | Back to browse issues page

XML Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Rashidinejad F, Osanloo M, Rezai B. Cutoff grades optimization with environmental management A case study: Sungun Copper Project . IJIEPR 2008; 19 (5) :1-13
URL: http://ijiepr.iust.ac.ir/article-1-121-en.html
1- , morteza.osanloo@gmail.com
Abstract:   (18979 Views)

Cutoff grade is a grade used to assign a destination label to a parcel of material. The optimal cutoff grades depend on all the salient technological features of mining, such as the capacity of extraction and of milling, the geometry and geology of the orebody, and the optimal grade of concentrate to send to the smelter. The main objective of each optimization of mining operation is to maximize the net present value of the whole mining project, but this approach without consideration of environmental issues during planning is not really an optimum design. Lane formulation among the all presented algorithms is the most commonly used method for optimization of cutoff grades. All presented models for optimum cutoff grades are ore-oriented and in none of them the costs related to waste materials which must to be minimized during the mine life are considered. In this paper, after comparison of traditional and modern approaches for cutoff grade optimization in open pit mines, a real case study is presented and discussed to ensure optimality of the cutoff grades optimization process.

Full-Text [PDF 645 kb]   (5955 Downloads)    
Type of Study: Research | Subject: Material Managment
Received: 2010/07/19 | Published: 2008/07/15

Cited by [1] [PDF 177 KB]  (595 Download)
Add your comments about this article : Your username or Email:
CAPTCHA

Send email to the article author


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.