S.m. Seyed-Hosseini, M. Sabzehparvar, S. Nouri ,
Volume 18, Issue 3 (International Journal of Engineering 2007)
Abstract
Abstract: This paper presents an exact model and a genetic algorithm for the multi-mode resource constrained project scheduling problem with generalized precedence relations in which the duration of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. All resources considered are renewable. The objective is to determine a mode, the amount of continuous crashing, and a start time for each activity so that all constraints are obeyed and the project duration is minimized. Project scheduling of this type occurs in many fields for instance, predicting the resources and duration of activities in software development projects. A key feature of the model is that none of the typical models can cope with the continuous resource constraints. Computational results with a set of 100 generated instances have been reported and the efficiency of the proposed model has been analyzed.
Behin Elahi, Seyed Mohammad Seyed-Hosseini, Ahmad Makui,
Volume 22, Issue 2 (IJIEPR 2011)
Abstract
Supplier selection, Multi-objective decision making, Fuzzy Compromise programming, Supply chain management, Quantity discount . |
Supplier selection is naturally a complex multi-objective problem including both quantitative and qualitative factors. This paper deals with this issue from a new view point. A quantity discount situation, which plays a role of motivator for buyer, is considered. Moreover, in order to find a reasonable compromise solution for this problem, at first a multi-objective modeling is presented. Then a proposed fuzzy compromise programming is utilized to determine marginal utility function for each criterion. Also, group decision makers’ preferences have taken into account and the weight of each criterion has been measured by forming pair-wise comparison matrixes. Finally the proposed approach is conducted for a numerical example and its efficacy and efficiency are verified via this section. The results indicate that the proposed method expedites the generation of compromise solution .