Search published articles


Showing 30 results for Simulation

M. Ebrahimi, R. Farnoosh,
Volume 20, Issue 4 (4-2010)
Abstract

This paper is intended to provide a numerical algorithm based on random sampling for solving the linear Volterra integral equations of the second kind. This method is a Monte Carlo (MC) method based on the simulation of a continuous Markov chain. To illustrate the usefulness of this technique we apply it to a test problem. Numerical results are performed in order to show the efficiency and accuracy of the present method.
Rasoul Haji, Mohammadmohsen Moarefdoost, Seyed Babak Ebrahimi,
Volume 21, Issue 4 (12-2010)
Abstract

  This paper aims to evaluate inventory cost of a Two-echelon serial supply chain system under vendor managed inventory program with stochastic demand, and examine the effect of environmental factors on the cost of overall system. For this purpose, we consider a two-echelon serial supply chain with a manufacturer and a retailer. Under Vendor managed inventory program, the decision on inventory levels are made by manufacturer centrally. In this paper, we assume that the manufacturer monitors inventory levels at the retailer location and replenishes retailer's stock under (r, n, q) policy moreover, the manufacturer follows make-to-order strategy in order to respond retailer's orders. In the other word, when the inventory position at the retailer reaches reorder point, r, the manufacturer initiates production of Q=nq units with finite production rate, p. The manufacturer replenishes the retailer's stock with replenishment frequency n, and the complete batch of q units to the retailer during the production time. We develop a renewal reward model for the case of Poisson demand, and drive the mathematical formula of the long run average total inventory cost of system under VMI. Then, by using Monte Carlo simulation, we examine the effect of environmental factors on the cost of overall system under VMI .


F Etebari, M. Abedzadeh , F. Khoshalhan,
Volume 22, Issue 1 (3-2011)
Abstract

Improvement in supply chain performance is one of the major issues in the current world. Lack of coordination in the supply chain is the main drawback of supply chain that many researchers have proposed different methodologies to overcome it. VMI (Vendor-managed inventory) is one of these methodologies that implementing it has some obstacles. This paper proposes new model that is agent-managed SC. This paper is trying to use intelligent agent technology in the supply chain. In this paper supply chain assessment performance measure indicators have been divided into three categories cost, flexibility and customer responsiveness indicators. In the first category we use holding and backordered inventory costs, for second category, bullwhip effect are used and for the last one customer responsiveness indicator has been applied. Bullwhip effect is one of the main phenomena’s that has been tried to reduce it with the agent-based systems.
Yahia Zare Mehrjerdi, Maryam Dehghan,
Volume 24, Issue 1 (2-2013)
Abstract

Abstract In the dynamic and competitive market, managers seek to find effective strategies for new products development. Since There has not been a thorough research in this field, this study is based on a review on the risks exist in the NPD process and an analysis of risks through FMEA approach to prioritize the existent risks and a modeling behavior of the NPD process and main risks using system dynamics. First, we present new product development concepts and definition. We then based our study on a literature review on the NPD risks and then provide an FMEA approach to define risks priority. Using the obtained main risks, we model the NPD process risks applying system dynamics to analyze the system and the risks effect on. A safety clothing manufacturer is considered as a case study.
Mostafa Khanzadi, Farnad Nasirzadeh, Mahdi Rezaie,
Volume 24, Issue 3 (9-2013)
Abstract

Allocation of construction risks between clients and their contractors has a significant impact on the total construction costs. This paper presents a system dynamics (SD)-based approach for quantitative risk allocation. Using the proposed SD based approach, all the factors affecting the risk allocation process are modeled. The contractor’s defensive strategies against the one-sided risk allocation are simulated using governing feedback loops. The full-impact of different risk allocation strategies may efficiently be modeled, simulated and quantified in terms of time and cost by the proposed object-oriented simulation methodology. The project cost is simulated at different percentages of risk allocation and the optimum percentage of risk allocation is determined as a point in which the project cost is minimized. To evaluate the performance of the proposed method, it has been implemented in a pipe-line project. The optimal risk allocation strategy is determined for the inflation risk as one of the most important identified risks.
M. Reza Peyghami, Abdollah Aghaie, Hadi Mokhtari,
Volume 24, Issue 3 (9-2013)
Abstract

In this paper, we consider a stochastic Time-Cost Tradeoff Problem (TCTP) in PERT networks for project management, in which all activities are subjected to a linear cost function and assumed to be exponentially distributed. The aim of this problem is to maximize the project completion probability with a pre-known deadline to a predefined probability such that the required additional cost is minimized. A single path TCTP is constructed as an optimization problem with decision variables of activity mean durations. We then reformulate the single path TCTP as a cone quadratic program in order to apply polynomial time interior point methods to solve the reformulation. Finally, we develop an iterative algorithm based on Monte Carlo simulation technique and conic optimization to solve general TCTP. The proposed approach has been tested on some randomly generated test problems. The results illustrate the good performance of our new approach.
Yahia Zare Mehrjerdi, Ali Nadizadeh,
Volume 27, Issue 1 (3-2016)
Abstract

Using Greedy Clustering Method to Solve Capacitated Location-Routing Problem with Fuzzy Demands Abstract In this paper, the capacitated location routing problem with fuzzy demands (CLRP_FD) is considered. In CLRP_FD, facility location problem (FLP) and vehicle routing problem (VRP) are observed simultaneously. Indeed the vehicles and the depots have a predefined capacity to serve the customersthat have fuzzy demands. To model the CLRP_FD, a fuzzy chance constrained program is designed, based on fuzzy credibility theory. To solve the CLRP_FD, a greedy clustering method (GCM) including the stochastic simulation is proposed. Finally, to obtain the best value of the preference index of the model and analysis its influence on the final solutions of the problem, numerical experiments are carried out. Keywords: Capacitated location routing problem, Fuzzy demand, Credibility theory, Stochastic simulation, Ant colony system.


Parham Azimi, Naeim Azouji,
Volume 28, Issue 4 (11-2017)
Abstract

In this paper a novel modelling and solving method has been developed to address the so-called resource constrained project scheduling problem (RCPSP) where project tasks have multiple modes and also the preemption of activities are allowed. To solve this NP-hard problem, a new general optimization via simulation (OvS) approach has been developed which is the main contribution of the current research. In this approach, the mathematical model of the main problem is relaxed and solved then the optimum solutions were used in the corresponding simulation model to produce several random feasible solutions for the main problem. Finally, the most promising solutions were selected as the initial population of a genetic Algorithm (GA). To test the efficiency of the problem, several test problems were solved by the proposed approach and according to the results, the proposed concept has a very good performance to solve such a complex combinatoral problem. Also, the concept could be easily applied for other similar combinatorics. 


Mahdieh Akhbari,
Volume 29, Issue 2 (6-2018)
Abstract

The aim of this study is to present a new method to predict project time and cost under uncertainty. Assuming that what happens in projects implementation which is expressed in the form of Earned Value Management (EVM) indicators is primarily related to the nature of randomness or unreliability, in this study, by using Monte Carlo simulation, and assuming a specific distribution for the time and cost of project activities, a significant number of predicting scenarios will be simulated. According to the data, an artificial neural network is used as efficient data mining methods to estimate the project time and cost at completion.
Arezoo Jahani, Parastoo Mohammadi, Hamid Mashreghi,
Volume 29, Issue 2 (6-2018)
Abstract

Innovation & Prosperity Fund (IPfund) in Iran as a governmental organization aims to develop new technology-based firms (NTBF) by its available resources through financing these firms. The innovative projects which refer to IPfund for financing are in a stage which can receive both fixed rate facilities and partnership in the projects, i.e. profit loss sharing (PLS). Since this fund must protect its initial and real value of its capital against inflation rate, therefore, this study aims to examine the suitable financing methods with considering risk. For this purpose we study on risk assessment models to see how to use risk adjusted net present value for knowledge based projects. On this basis, the NPV of a project has been analyzed by taking into account the risk variables (sales revenue and the cost of fixed investment) and using Monte Carlo simulation. The results indicate that in most cases for a project, the risk adjusted NPV in partnership scenario is more than the other scenario. In addition to, partnership in projects which demand for industrial production facilities is preferable for the IPfund than projects calling for working capital.
Zahra Karimi Ezmareh, Gholam Hossein Yari,
Volume 30, Issue 2 (6-2019)
Abstract

In this paper, a new distribution that is highly applicable in the fields of reliability and economics is introduced. Also the parameters of this distribution is estimated using two methods of Maximum Likelihood and Bayes with two prior distributions Weibull and Uniform, and these two methods are compared using Monte-Carlo simulation. Finally, this new model is fit on the real data(with the failure time of 84 aircraft) and some of comparative criteria are calculated to confirm superiority of the proposed model compared to other models.
Mohmmad Anvar Adibhesami, Ahmad Ekhlassi, Ali Mohammad Mosadeghrad, Amirhossein Mohebifar,
Volume 30, Issue 2 (6-2019)
Abstract

The CPM (critical path method) technique is to search out the longest path to try and do activities, so as to compress and cut back the time it takes for a project, which finally ends up inside the creation of an identical and intensive network of activities inside the targeted work. This formal random simulation study has been recognized as a remedy for the shortcomings that are inherent to the classic critical path technique (CPM) project analysis. Considering the importance of time, the cost of activities within the network, and rising the calculation of the critical path during this study, Critical Path technique has been applied to improve critical routing intelligence. This study, by simulating and analyzing dragonfly's splotched and regular patterns, has obtained the precise algorithm of attainable paths with the smallest amount cost and time for every activity. This has been done to put down the restrictions and enhance the computing potency of classic CPM analysis. The simulation results of using Dragonfly Algorithm (DA) in CPM, show the longest path in shortest time with the lowest cost. This new answer to CPM network analysis can provide project management with a convenient tool.
 
Mohammad Sarvar Masouleh, Amir Azizi,
Volume 30, Issue 4 (12-2019)
Abstract

The present research aims at investigating feasible improvements by determining optimal number of stations and required workforce using a simulation system, with the ultimate goal of reaching optimal throughput while respecting the problem constraints in an attempt to achieve maximum feasible performance in terms of production rate. For this purpose, similar research works were investigated by reviewing the relevant pieces of the literature on simulation model, car signoff station, and techniques for optimizing the station, and the model of the car signoff unit was designed using data gathering tools, existing documents, and actual observations. Subsequently, the model was validated by means of descriptive statistics and analysis of variance (ANOVA). Furthermore, available data was analyzed using ARENA and SPSS software tools. In a next step, potential improvements of the unit were identified and the model was evaluated accordingly. The results indicated that some 80% of the existing problems could be addressed by appropriately planning for human resources, on-time provision of the required material at reworking units, and minimization of transportation at the stations that contributed the most to the working queue. Thus, the waiting time per station could be minimized while increasing the production rate.
Dr V.k. Chawla, A.k. Chanda, Surjit Angra,
Volume 31, Issue 1 (3-2020)
Abstract

The selection of an appropriate cutting tool for the production of different jobs in a flexible manufacturing system (FMS) can play a pivotal role in the efficient utilization of the FMS. The selection procedure of a cutting tool for different production operations becomes more significant with the availability of similar types of tools in the FMS. In order to select and allocate appropriate tool for various production operations in the FMS, the tool selection rules are commonly used. The application of tool selection rules is also observed to be beneficial when a system demands two or more tools for the production operations at different work centers at the same time in the FMS. In this paper, investigations are carried out to evaluate the performance of different tool selection rules in the FMS. The performance of the tool selection rules is evaluated by simulation with respect to different performance parameters in the FMS namely makespan, mean work center utilization (%) and mean automatic tool transporter (ATT) utilization (%).
 
Rezvan Rezaei, Gholam Hossein Yari, Zahra Karimi Ezmareh,
Volume 31, Issue 3 (9-2020)
Abstract

In this paper, a new five-parameter distribution is proposed that is called MarshallOlkin Gompertz Makeham distribution(MOGM). This new model is applicable in analysis lifetime data, engineering and actuarial. In this research, some properties of the new model such as mode, moment, Reyni entropy, Tsallis entropy, quantile function and the hazard rate function which is decreasing and unimodal, are studied. The unknown parameters of the MOGM distribution are estimated using the maximum likelihood and Bayes methods. Then these methods are compared using Monte Carlo simulation and the best estimator is proposed. Finally, applications of the proposed model are illustrated to show its usefulness.
Parham Azimi, Shahed Sholekar,
Volume 32, Issue 1 (1-2021)
Abstract

According to the real projects’ data, activity durations are affected by numerous parameters. In this research, we have developed a multi-resource multi objective multi-mode resource constrained scheduling problem with stochastic durations where the mean and the standard deviation of activity durations are related to the mode in which each activity is performed. The objective functions of model were to minimize the net present value and makespan of the project. A simulation-based optimization approach was used to handle the problem with several stochastic events. This feature helped us to find several solutions quickly while there was no need to take simplification assumptions. To test the efficiency of the proposed algorithm, several test problems were taken from the PSPLIB directory and solved. The results show the efficiency of the proposed algorithm both in quality of the solutions and the speed.

Mohsen Khezeli, Esmaeil Najafi, Mohammad Haji Molana, Masoud Seidi,
Volume 32, Issue 2 (6-2021)
Abstract

One of the most important fields of logistic network is transportation network design that has an important effect on strategic decisions in supply chain management. It has recently attracted the attention of many researchers. In this paper, a multi-stage and multi-product logistic network design is considered.
This paper presents a hybrid approach based on simulation and optimization (Simulation based optimization), the model is formulated and presented in three stages.  At first, the practical production capacity of each product is calculated using the Overall Equipment Effectiveness (OEE) index, in the second stage, the optimization of loading schedules is simulated. The layout of the loading equipment, the number of equipment per line, the time of each step of the loading process, the resources used by each equipment were simulated, and the output of the model determines the maximum number of loaded vehicles in each period. Finally, a multi-objective model is presented to optimize the transportation time and cost of products. A mixed integer nonlinear programming (MINLP) model is formulated in such a way as to minimize transportation costs and maximize the use of time on the planning horizon. We have used Arena simulation software to solve the second stage of the problem, the results of which will be explained. It is also used GAMS software to solve the final stage of the model and optimize the transporting cost and find the optimal solutions. Several test problems were generated and it showed that the proposed algorithm could find good solutions in reasonable time spans.
Zahra Karimi Ezmareh, Gholamhossein Yari,
Volume 33, Issue 4 (12-2022)
Abstract

‎Recently, generalized distributions have received much attention due to their high applicability and flexibility. This paper introduces a new five-parameter distribution called Kumaraswamy-G generalized Gompertz distribution, which is widely used in the field of survival and lifetime data. In introducing a new distribution, it is important to study the statistical properties and the estimation of its parameters. Therefore, this paper studies the statistical properties of this new distribution. In addition, the parameters of this distribution are estimated by three methods. Finally, using a real dataset, the performance of the introduced distribution is investigated.

Abolfazl Khatti Dizabadi, Abdollah Arasteh, Mohammad Mahdi Paydar,
Volume 33, Issue 4 (12-2022)
Abstract

Supply chain management is one of the requirements for achieving economic growth in any supply chain. If managers' decisions are optimally allocated, it will be possible for companies and industries with a competitive and profitable advantage to grow and develop. The main desire of any company for survival is to minimize costs and maximize profitability. Due to the increasing complexity and dynamics of the situation, decision-making in this area requires more advanced analytical methods. Accordingly, the Real options theory has emerged, which introduces a new way of thinking about investing, especially in conditions of uncertainty. In this paper, a multi-period model is considered that examines the demand uncertainty in each period and also uses the Real options theory to seek the optimal strategy for investors in conditions of uncertainty and the effect of investors’ discretion on it. Using a decision tree to estimate the probable demand in each period and using Monte Carlo simulations to identify the lowest cost scenario in each period, the model has been solved in this research. In the case of the uncertainty parameter, sensitivity analysis is performed, and under different values ​​of this parameter, the obtained result is evaluated and validated. And the extension of outsourcing will increase the company’s profitability and meet higher demand and lower costs.
Hamza Samouche, Abdellah El Barkany, Ahmed Elkhalfi,
Volume 34, Issue 2 (6-2023)
Abstract

Sales and operations planning (S&OP) is considered as an important tool at the planning strategic level. Its models vary depending on industries. The Asian model is known to be very developed. Having several parameters, the Asian model proves to be an effective tool, precisely for the study of capacity. However, after several searches made in various databases, we did not find any concrete model actually used in industry and whose parameters are presented and which defines the analysis logic to better align supply and demand. In this article, we will carry out various simulations on the basis of the data of a model of sales and operations planning used in a wire harnesses factory, in order to explain the decision-making process during S&OP meetings. The parameters of the model and the various constraints that were facing the sales and operations planning team are presented and discussed as well as the financial consequences of certain decisions. As a result of this study, we can notice that S&OP is indeed a powerful tool that makes it possible to detect in advance the various constraints whose resolution concludes in an optimal alignment between customer demand and factory capacity.
 

Page 1 from 2    
First
Previous
1