Search published articles



A. Amid, S.h. Ghodsypour,
Volume 19, Issue 4 (12-2008)
Abstract

  Supplier selection is one of the most important activities of purchasing departments. This importance is increased even more by new strategies in a supply chain, because of the key role suppliers perform in terms of quality, costs and services which affect the outcome in the buyer’s company. Supplier selection is a multiple criteria decision making problem in which the objectives are not equally important. In practice, vagueness and imprecision of the goals, constraints and parameters in this problem make the decision making complicated. Simultaneously, in this model, vagueness of input data and varying importance of criteria are considered. In real cases, where Decision- Makers (DMs) face up to uncertain data and situations, the proposed model can help DMs to find out the appropriate ordering from each supplier, and allows purchasing manager(s) to manage supply chain performance on cost, quality, on time delivery, etc. An additive weighted model is presented for fuzzy multi objective supplier selection problem with fuzzy weights. The model is explained by an illustrative example.


S.k. Charsoghi, A. Sadeghi,
Volume 19, Issue 4 (12-2008)
Abstract

In this paper, a two-echelon supply chain, which includes two products based on the following considerations, has been studied and the bullwhip effect is quantified. Providing a measure for bullwhip effect that enables us to analyze and reduce this phenomenon in supply chains with two products is the basic purpose of this paper. Demand of products is presented by the first order vector autoregressive time series and ordering system is established according to order up to policy. Moreover, lead-time demand forecasting is based on moving average method because this forecasting method is used widely in real world. Based on these assumptions, a general equation for bullwhip effect measure is derived and there is a discussion about non-existence of an explicit expression for bullwhip effect measure according to the present approach on the bullwhip effect measure. However, bullwhip effect equation is presented for some limited cases. Finally, bullwhip effect in a two-product supply chain is analyzed by a numerical example.
K. Shahanaghi, V.r. Ghezavati,
Volume 19, Issue 4 (12-2008)
Abstract

  In this paper, we present the stochastic version of Maximal Covering Location Problem which optimizes both location and allocation decisions, concurrently. It’s assumed that traveling time between customers and distribution centers (DCs) is uncertain and described by normal distribution function and if this time is less than coverage time, the customer can be allocated to DC. In classical models, traveling time between customers and facilities is assumed to be in a deterministic way and a customer is assumed to be covered completely if located within the critical coverage of the facility and not covered at all outside of the critical coverage. Indeed, solutions obtained are so sensitive to the determined traveling time. Therefore, we consider covering or not covering for customers in a probabilistic way and not certain which yields more flexibility and practicability for results and model. Considering this assumption, we maximize the total expected demand which is covered. To solve such a stochastic nonlinear model efficiently, simulation and genetic algorithm are integrated to produce a hybrid intelligent algorithm. Finally, some numerical examples are presented to illustrate the effectiveness of the proposed algorithm.


H. Teimory, H. Mirzahosseinian, A. Kaboli,
Volume 19, Issue 4 (12-2008)
Abstract

  The advent of e-commerce has prompted many manufacturers to redesign their traditional channel structure by engaging in direct sales. In this paper, we present a dual channel inventory model based on queuing theory in a manufacturer-retailer supply chain, consisting of a traditional retail channel and a direct channel which stocks are kept in both upper and lower echelon. The system receives stochastic demand from the both channel which each channel has an independent demand arrival rate. A lost-sales model which no backorder is allowed is supposed. The replenishment lead times are assumed independent exponential random variables for both warehouse and the retail store. Under the replenishment inventory policy, the inventory position is kept constant at a base-stock level. To analyze the chain performance, an objective function included holding and lost sales costs is defined. At the end, a proposed algorithm named, Best Neighborhood (BN) is used to find a good solution for inventory and the results are compared with Simulated Annealing (SA) solutions.


M. Ghazanfari, K. Noghondarian, A. Alaedini,
Volume 19, Issue 4 (12-2008)
Abstract

  Although control charts are very common to monitoring process changes, they usually do not indicate the real time of the changes. Identifying the real time of the process changes is known as change-point estimation problem. There are a number of change point models in the literature however most of the existing approaches are dedicated to normal processes. In this paper we propose a novel approach based on clustering techniques to estimate Shewhart control chart change-point when a sustained shift is occurrs in the process mean. For this purpose we devise a new clustering mechanism, a new similarity measure and a new objective function. The proposed approach is not only capable of detecting process change-points, but also automatically estimates the true values of the out-of-control parameters of the process. We also compare the performance of the proposed approach with existing methods.


R. Tavakolimoghadam, M. Vasei,
Volume 19, Issue 4 (12-2008)
Abstract

  In this paper, a single machine sequencing problem is considered in order to find the sequence of jobs minimizing the sum of the maximum earliness and tardiness with idle times (n/1/I/ETmax). Due to the time complexity function, this sequencing problem belongs to a class of NP-hard ones. Thus, a special design of a simulated annealing (SA) method is applied to solve such a hard problem. To compare the associated results, a branch-and-bound (B&B) method is designed and the upper/lower limits are also introduced in this method. To show the effectiveness of these methods, a number of different types of problems are generated and then solved. Based on the results of the test problems, the proposed SA has a small error, and computational time for achieving the best result is very small.


R. Sadeghian, G.r. Jalali-Naini, J. Sadjadi, N. Hamidi Fard ,
Volume 19, Issue 4 (12-2008)
Abstract

  In this paper Semi-Markov models are used to forecast the triple dimensions of next earthquake occurrences. Each earthquake can be investigated in three dimensions including temporal, spatial and magnitude. Semi-Markov models can be used for earthquake forecasting in each arbitrary area and each area can be divided into several zones. In Semi-Markov models each zone can be considered as a state of proposed Semi-Markov model. At first proposed Semi-Markov model is explained to forecast the three mentioned dimensions of next earthquake occurrences. Next, a zoning method is introduced and several algorithms for the validation of the proposed method are also described to obtain the errors of this method.


F. Rashidinejad, M. Osanloo , B. Rezai ,
Volume 19, Issue 5 (7-2008)
Abstract

Cutoff grade is a grade used to assign a destination label to a parcel of material. The optimal cutoff grades depend on all the salient technological features of mining, such as the capacity of extraction and of milling, the geometry and geology of the orebody, and the optimal grade of concentrate to send to the smelter. The main objective of each optimization of mining operation is to maximize the net present value of the whole mining project, but this approach without consideration of environmental issues during planning is not really an optimum design. Lane formulation among the all presented algorithms is the most commonly used method for optimization of cutoff grades. All presented models for optimum cutoff grades are ore-oriented and in none of them the costs related to waste materials which must to be minimized during the mine life are considered. In this paper, after comparison of traditional and modern approaches for cutoff grade optimization in open pit mines, a real case study is presented and discussed to ensure optimality of the cutoff grades optimization process.


F. Sereshki, S.a. Hosseini, N. Aziz , I. Porter ,
Volume 19, Issue 5 (7-2008)
Abstract

The Outburst can be defined as a sudden release of coal and rock accompanied by large quantities of gas into the underground coal mine workings which represents a major hazard in underground coal mines. Gas drainage has been proven to be successful in reducing outburst hazards by decreasing the in-situ gas pressure. One of aspect of gas drainage from coal seams is coal matrix volume changes. Current study is primarily concerned with experimental studies related to coal volume change (coal shrinkage) under various gas types and pressures. Two types of tests were conducted on each sample, the adsorption test for coal swelling and the desorption test for coal shrinkage. The gases used in the study were CH4, CO2, CH4/CO2 (50-50% volume), and N2. In this research, tests were conducted with respect to volumetric change behavior in different gases and their corresponding comparative results were presented.


A.d. Akbari, M. Osanloo , M.a. Shirazi ,
Volume 19, Issue 5 (7-2008)
Abstract

Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price. Metal price fluctuations in recent years were exaggerated and imposed a high degree of uncertainty to the mine planning procedure while none of the existent algorithms of the pit limit determination consider the metal price uncertainty. Real Option Approach (ROA) is an efficient method of decision making in the condition of uncertainty. This approach usually used for evaluation of defined natural resources projects up to now. This study considering the metal price uncertainty used real option approach to prepare a methodology for determining the Ultimate Pit Limits (UPL). The study was carried out on a non-ferrous metallic cylindrical ore deposit but the achieved methodology can be adjusted for all kinds of the deposits. The achieved methodology was comprehensively described through the examples in a way that can be used by the mine planners.


M. Ameli, A. Mirzazadeh, M. Shirazi,
Volume 24, Issue 1 (2-2013)
Abstract

It was suggested in 2004 by some researchers that it might be possible to improve production systems performance by applying the first and second laws of thermodynamics to reduce system entropy. Then these laws were used to modify the economic order quantity (EOQ) model to derive an equivalent entropic order quantity (EnOQ). Moreover the political instability or uncertainty of a country (as well as the whole world) leads to a much more unstable situation in the present world economy. Thus, changes in inflation take place, and it is needed to consider uncertain inflation rate. In this paper we extend the EnoQ model by considering deteriorating items with imperfect quality and price dependent demand. We also assume fuzzy inflation and discount rates.‌ A mathematical model is developed to determine the number of cycles that maximizes the present value of total revenue in a finite planning horizon. The fuzzified model for inflation and discount rate is formulated and solved by two methods: signed distance and fuzzy numbers ranking. Numerical examples are presented and results are discussed. Results show that the number of cycles decreases in fuzzy inflationary conditions. They also illustrate that defuzzification method results in more cycles than fuzzy method.
Ramin Sadeghian,
Volume 27, Issue 2 (6-2016)
Abstract

Generally ordering policies are done by two methods, including fix order quantity (FOQ) and fix order period (FOP). These methods are static and either the quantity of ordering or the procedure of ordering is fixing in throughout time horizon. In real environments, demand is varying in any period and may be considered as uncertainty. When demand is variable in any period, the traditional and static ordering policies with fix re-order points cannot be efficient. On the other hand, sometimes in real environments some costs may not be well-known or precise. Some costs such as holding cost, ordering cost and so on. Therefore, using the cost based inventory models may not be helpful. In this paper, a model is developed which can be used in the cases of stochastic and irregular demand, and also unknown costs. Also some attributes consisting of expected positive inventory level, expected negative inventory level and inventory confidence level are considered as objective functions instead the objective function of total inventory cost. A numerical example is also presented for more explanation.


Zahra Karimi Ezmareh, Gholam Hossein Yari,
Volume 30, Issue 2 (6-2019)
Abstract

In this paper, a new distribution that is highly applicable in the fields of reliability and economics is introduced. Also the parameters of this distribution is estimated using two methods of Maximum Likelihood and Bayes with two prior distributions Weibull and Uniform, and these two methods are compared using Monte-Carlo simulation. Finally, this new model is fit on the real data(with the failure time of 84 aircraft) and some of comparative criteria are calculated to confirm superiority of the proposed model compared to other models.
Sahebe Esfandiari, Hamid Mashreghi, Saeed Emami,
Volume 30, Issue 2 (6-2019)
Abstract

We study the problem of order acceptance, scheduling and pricing (OASP) in parallel machine environment. Each order is characterized by due date, release date, deadline, controllable processing time, sequence dependent set up time and price in MTO system. We present a MILP formulation to maximize the net profit. Then under joint optimization approach, the pricing decisions set for unrelated parallel machine environment. The results show that the basic developed problem can solve the scheduling decisions based on different levels of products’ priced. Thus the problem solves these two categories of decisions simultaneously. Moreover, the changes of accepted orders in pricing levels can be analyzed regarding its dependency to price elasticity of items for future research.
Malieheh Ebrahimi, Reza Tavakkoli-Moghaddam, Fariborz Jolai,
Volume 30, Issue 2 (6-2019)
Abstract

Customization is increasing so build-to-order systems are given more attention to researchers and practitioners. This paper presents a new build-to-order supply chain model with multiple objectives that minimize the total cost and lead time, and maximize the quality level.  The model is first formulated in a deterministic condition, and then investigated the uncertainty of the cost and quality by the stochastic programming based on the scenario. The return policy and outsourcing are the new issues in a build-to-order supply chain by considering the cost and inventory. A Benders decomposition algorithm is used to solve and validate the model. Finally, the related results are analyzed and compared with the results obtained by CPLEX for deterministic and stochastic models.
Ebrahim Asadi-Gangraj, Fatemeh Bozorgnezhad, Mohammad Mahdi Paydar,
Volume 30, Issue 2 (6-2019)
Abstract

In many real scheduling situations, it is necessary to deal with the worker assignment and job scheduling together. However, in traditional scheduling problems, only the machine is assumed to be a constraint and there isn’t any constraint about workers. This assumption could be due to the lower cost of workers compared to machines or the complexity of workers' assignment problems. This research proposes a flexible flow shop scheduling problem with two simultaneous issues: finding the best worker assignment, and solving the corresponding scheduling problem. We present a mathematical model that extends flexible flow shop scheduling problem to admit the worker assignment. Due to the NP-hardness of the research problem, two approximation approaches based on particle swarm optimization, named PSO and SPSO, are applied to minimize the makespan. The experimental results show that the proposed algorithms can efficiently minimize the makespan but the SPSO generates better solutions especially for large-size problems.
Mohmmad Anvar Adibhesami, Ahmad Ekhlassi, Ali Mohammad Mosadeghrad, Amirhossein Mohebifar,
Volume 30, Issue 2 (6-2019)
Abstract

The CPM (critical path method) technique is to search out the longest path to try and do activities, so as to compress and cut back the time it takes for a project, which finally ends up inside the creation of an identical and intensive network of activities inside the targeted work. This formal random simulation study has been recognized as a remedy for the shortcomings that are inherent to the classic critical path technique (CPM) project analysis. Considering the importance of time, the cost of activities within the network, and rising the calculation of the critical path during this study, Critical Path technique has been applied to improve critical routing intelligence. This study, by simulating and analyzing dragonfly's splotched and regular patterns, has obtained the precise algorithm of attainable paths with the smallest amount cost and time for every activity. This has been done to put down the restrictions and enhance the computing potency of classic CPM analysis. The simulation results of using Dragonfly Algorithm (DA) in CPM, show the longest path in shortest time with the lowest cost. This new answer to CPM network analysis can provide project management with a convenient tool.
 
Rahul S Mor, Arvind Bhardwaj, Vishal Kharka, Manjeet Kharub,
Volume 32, Issue 2 (6-2021)
Abstract

Inventory management plays a vital role in attaining the desired service level and prevents excess capital from being tied up in the form of dead stock. This paper presents a framework to effectively determine the items subject to obsolescence in an automotive spare parts warehouse. The inventory management techniques are applied to minimize the costs and a framework is proposed based on ABC-XYZ and FSN analysis to prioritize the spare parts based on their criticality. Further, the importance of items in the warehouse is carried out to eliminate the dead stock. The ABC classification findings reveal that A-class items accounted for 10.39% and hold the highest inventory value grouping. XYZ classification concludes that much priority should be given to the management of 52.7% of items under the Z category as the demand trend of these items is highly fluctuating. The N category items have no demand in recent times and need immediate attention, thereby preventing further unnecessary procurement. Thus, based on the ABC-XYZ and FSN analysis, the non-critical items, i.e., the non-moving items having fluctuating demand, are sorted out.
Dwi Kurniawan, Aghnia Nazhiifah Ulhaq, Aditya Fadhilah Althofian, Rubby Nur Rachman,
Volume 35, Issue 4 (12-2024)
Abstract

In industrial and commercial settings, inventory systems often involve managing multiple products with diverse demand patterns, making the direct application of the single-item newsvendor model inefficient. To address this complexity, this study proposes an adaptation of the newsvendor model through demand aggregation, where related items are grouped into a product family. By aggregating demand and financial parameters, the traditional newsvendor approach can be extended to multi-item systems, simplifying the inventory management process. This method was tested in two different case studies—a coffee roaster company and a meatball producer—demonstrating its validity and applicability. The aggregated newsvendor model was found to enhance inventory accuracy and efficiency, reducing random error and improving operational performance. This approach offers a valuable extension of the newsvendor model, with potential for broader application across various industries.


Page 3 from 4