Search published articles


Showing 2 results for Benders Decomposition.

Malieheh Ebrahimi, Reza Tavakkoli-Moghaddam, Fariborz Jolai,
Volume 30, Issue 2 (6-2019)
Abstract

Customization is increasing so build-to-order systems are given more attention to researchers and practitioners. This paper presents a new build-to-order supply chain model with multiple objectives that minimize the total cost and lead time, and maximize the quality level.  The model is first formulated in a deterministic condition, and then investigated the uncertainty of the cost and quality by the stochastic programming based on the scenario. The return policy and outsourcing are the new issues in a build-to-order supply chain by considering the cost and inventory. A Benders decomposition algorithm is used to solve and validate the model. Finally, the related results are analyzed and compared with the results obtained by CPLEX for deterministic and stochastic models.
Ali Salmasnia, Elahe Heydarnezhad, Hadi Mokhtari,
Volume 35, Issue 2 (6-2024)
Abstract

Abstract. One of the important problems in managing construction projects is selecting the best alternative for activities' execution to minimize the project's total cost and time. However, uncertain factors often have negative effects on activity duration and cost. Therefore, it is crucial to develop robust approaches for construction project scheduling to minimize sensitivity to disruptive noise factors. Additionally, existing methods in the literature rarely focus on environmentally conscious construction management. Achieving these goals requires incorporating the project scheduling problem with multiple objectives. This study proposes a robust optimization approach to determine the optimal construction operations in a project scheduling problem, considering time, cost, and environmental impacts (TCE) as objectives. An analytical algorithm based on Benders decomposition is suggested to address the robust problem, taking into account the inherent uncertainty in activity time and cost. To evaluate the performance of the proposed solution approach, a computational study is conducted using real construction project data. The case study is based on the wall of the east coast of Amirabad port in Iran. The results obtained using the suggested solution approach are compared to those of the CPLEX solver, demonstrating the appropriate performance of the proposed approach in optimizing the time, cost, and environment trade-off problem.


Page 1 from 1