Showing 9 results for Multi Objective

A. Amid, S.h. Ghodsypour,
Volume 19, Issue 4 (12-2008)
Abstract

  Supplier selection is one of the most important activities of purchasing departments. This importance is increased even more by new strategies in a supply chain, because of the key role suppliers perform in terms of quality, costs and services which affect the outcome in the buyer’s company. Supplier selection is a multiple criteria decision making problem in which the objectives are not equally important. In practice, vagueness and imprecision of the goals, constraints and parameters in this problem make the decision making complicated. Simultaneously, in this model, vagueness of input data and varying importance of criteria are considered. In real cases, where Decision- Makers (DMs) face up to uncertain data and situations, the proposed model can help DMs to find out the appropriate ordering from each supplier, and allows purchasing manager(s) to manage supply chain performance on cost, quality, on time delivery, etc. An additive weighted model is presented for fuzzy multi objective supplier selection problem with fuzzy weights. The model is explained by an illustrative example.


Maghsoud Amiri, Mohammadreza Sadeghi, Ali Khatami Firoozabadi, Fattah Mikaeili ,
Volume 25, Issue 1 (2-2014)
Abstract

The main goal in this paper is to propose an optimization model for determining the structure of a series-parallel system. Regarding the previous studies in series-parallel systems, the main contribution of this study is to expand the redundancy allocation parallel to systems that have repairable components. The considered optimization model has two objectives: maximizing the system mean time to first failure and minimizing the total cost of the system. The main constraints of the model are: maximum number of the components in the system, maximum and minimum number of components in each subsystem and total weight of the system. After establishing the optimization model, a multi objective approach of Imperialist Competitive Algorithm is proposed to solve the model.
Seyed Hossein Razavi Hajiagha, Shide Sadat Hashemi, Hannan Amoozad Mahdiraji,
Volume 25, Issue 3 (7-2014)
Abstract

Data envelopment analysis operates as a tool for appraising the relative efficiency of a set of homogenous decision making units. This methodology is applied widely in different contexts. Regarding to its logic, DEA allows each DMU to take its optimal weight in comparison with other DMUs while a similar condition is considered for other units. This feature is a bilabial characteristic which optimizes the performance of units in one hand. This flexibility on the other hand threats the comparability of different units because different weighting schemes are used for different DMUs. This paper proposes a unified model for determination of a common set of weights to calculate DMUs efficiency. This model is developed based on a multi objective fractional linear programming model that considers the original DEA's results as ideal solution and seeks a set of common weights that rank the DMUs and increase the model's discrimination power. Comparison of the proposed method with some of the previously presented models has shown its advantages as a DMUs ranking model.
Mahdi Karbasian, Batool Mohebi, Bijan Khayambashi, Mohsen Chesh Berah, Mehdi Moradi,
Volume 26, Issue 4 (11-2015)
Abstract

The present paper aims to investigate the effects of modularity and the layout of subsystems and parts of a complex system on its maintainability. For this purpose, four objective functions have been considered simultaneously: I) maximizing the level of accordance between system design and optimum modularity design,II) maximizing the level of accessibility and the maintenance space required,III) maximizing the providing of distance requirement and IV) minimizing the layout space. The first objective function has been put forward for the first time in the present paper and in it, the optimum system modularity design was determined using the Design Structure Matrix (DSM) technique.The second objective function is combined with the concept of Level of Repair Analysis (LoRA) and developed. Simultaneous optimization of the above-mentioned objective functions has not been considered in previous studies. The multi objective problem which has been put forward was applied on a laser range finder containing 17 subsystems and the modularity and optimum layout was determined using a multi objective particle swarm optimization (MOPSO) algorithm.

\"AWT


Ali Mohtashami, Alireza Alinezhad,
Volume 28, Issue 3 (9-2017)
Abstract

In this article, a multi objective model is presented to select and allocate the order to suppliers in uncertainty condition and in a multi source, multi customer and multiproduct case in a multi period state at two levels of supply chain. Objective functions considered in this study as the measures to evaluate suppliers are cost including purchase, transportation and ordering costs, timely delivering, shipment quality or wastages which are amongst major quality aspects, partial and general coverage of suppliers in respect of distance and finally suppliers weights making the products orders amount more realistic. The major limitations are price discount for products by suppliers which are calculated using signal function. In addition, suppliers weights in the fifth objective function is calculated using fuzzy Topsis technique. Lateness and wastes parameters in this model are considered as uncertain and random triangular fuzzy number. Finally the multi objective model is solved using two multi objective algorithms of Non-dominated Sorting Genetic Algorithm (NSGA-II) and Particle Swarm Optimization (PSO) and the results are analyzed using quantitative criteria Taguchi technique was used to regulate the parameters of two algorithms. 


Mojtaba Hamid, Mahdi Hamid, Mohammad Mahdi Nasiri, Mahdi Ebrahimnia,
Volume 29, Issue 2 (6-2018)
Abstract

Surgical theater is one of the most expensive hospital sources that a high percentage of hospital admissions are related to it. Therefore, efficient planning and scheduling of the operating rooms (ORs) is necessary to improve the efficiency of any healthcare system. Therefore, in this paper, the weekly OR planning and scheduling problem is addressed to minimize the waiting time of elective patients, overutilization and underutilization costs of ORs and the total completion time of surgeries. We take into account the available hours of ORs and the surgeons, legal constraints and job qualification of surgeons, and priority of patients in the model. A real-life example is provided to demonstrate the effectiveness and applicability of the model and is solved using ε-constraint method in GAMS software. Then, data envelopment analysis (DEA) is employed to obtain the best solution among the Pareto solutions obtained by ε-constraint method. Finally, the best Pareto solution is compared to the schedule used in the hospitals. The results indicate the best Pareto solution outperforms the schedule offered by the OR director.
Sasan Khalifehzadeh, Mohammad Bagher Fakhrzad,
Volume 29, Issue 3 (9-2018)
Abstract

Abstract
Production and distribution network (PDN) planning in multi-stage status is commonly complex. These conditions cause significant amount of uncertainty relating to demand and lead time. In this study, we introduce a PDN to deliver the products to customers in the least time and optimize the total cost of the network, simultaneously. The proposed network is four stage PDN including suppliers, producers, potential entrepots, retailers and customers with multi time period horizon with allowable shortage. A mixed integer programming model with minimizing total cost of the system and minimizing total delivery lead time is designed. We present a novel heuristic method called selective firefly algorithm (SFA) in order to solve several sized especially real world instances. In SFA, each firefly recognizes all better fireflies with more brightness and analyses its brightness change before moving, tacitly. Then, the firefly that makes best change is selected and initial firefly moves toward the selected firefly. Finally, the performance of the proposed algorithm is examined with solving several sized instances. The results indicate the adequate performance of the proposed algorithm.
Roza Babagolzadeh, Javad Rezaeian, Mohammad Valipour Khatir,
Volume 31, Issue 2 (6-2020)
Abstract

Sustainable supply chain networks have attracted considerable attention in recent years as a means of dealing with a broad range of environmental and social issues. This paper reports a multi-objective mixed-integer linear programming (MILP) model for use in the design of a sustainable closed loop supply chain network under uncertain conditions. The proposed model aims to minimize total cost, optimize environmental impacts of establishment of facilities, processing and transportation between each level as well as social impacts including customer satisfaction. Due to changes in business environment the uncertainty existed in the research problem, in this paper the chance constrained fuzzy programming approach applied to cope with uncertainties in parameter of the proposed model. Then the proposed multi-objective model solves as single-objective model using LP-metric method.
Mahdi Rezaei, Ali Salmasnia, Mohammad Reza Maleki,
Volume 34, Issue 3 (9-2023)
Abstract

This article develops an integrated model of transmitting strategies and operational activities to enhance the efficiency of supply chain management. As the second objective, this paper aims to improve supply chain performance management (SCPM) by employing proper decision-making approaches. The proposed model optimizes the performance indicator based on SCOR metrics. A process-based method is utilized for high-level decisions, while a mathematical programming method is proposed for low-level decisions. The suggested operational model takes some major supply chain properties such as multiple suppliers, multiple plants, multiple materials, and multiple produced items over several time periods into account. To solve the operational multi-objective optimization model, a goal programming approach is applied. The computational results are explained in terms of a numerical example, and a sensitivity analysis is performed to investigate how the performance of the supply chain is influenced by strategic scenario planning.
 

Page 1 from 1