Search published articles


Showing 26 results for Planning

M. Kargari, Z. Rezaee, H. Khademi Zare ,
Volume 18, Issue 3 (11-2007)
Abstract

 Abstract : In this paper a meta-heuristic approach has been presented to solve lot-size determination problems in a complex multi-stage production planning problems with production capacity constraint. This type of problems has multiple products with sequential production processes which are manufactured in different periods to meet customer’s demand. By determining the decision variables, machinery production capacity and customer’s demand, an integer linear program with the objective function of minimization of total costs of set-up, inventory and production is achieved. In the first step, the original problem is decomposed to several sub-problems using a heuristic approach based on the limited resource Lagrange multiplier. Thus, each sub-problem can be solved using one of the easier methods. In the second step, through combining the genetic algorithm with one of the neighborhood search techniques, a new approach has been developed for the sub-problems. In the third step, to obtain a better result, resource leveling is performed for the smaller problems using a heuristic algorithm. Using this method, each product’s lot-size is determined through several steps. This paper’s propositions have been studied and verified through considerable empirical experiments.

 


Esmaeil Shieh, Ayyoob Sharifi,
Volume 18, Issue 6 (7-2007)
Abstract

  The study seeks to address the importance of urban stream ecosystems from the perspective of urban ecology, human health and social well-being in the context of urban planning. The case study area is Paveh stream in the City of Paveh. The data from the case study area were gathered from questionnaire, existing scientific and library studies and by conducting interviews with residents and authorities. Once the importance of the biodiversity of the stream had been studied based on the existing ecological data, the social importance of the stream and the linkages between human health, social well-being and the biodiversity of the stream ecosystem were addressed.

  Based on the results of the survey and other sources of information, it was discussed that urban stream ecosystems can be rich in biodiversity and function as ecological movement corridors for species .Urban stream corridors can thus be an important part of the urban green infrastructure .Also we can make the weather fine, extend green space, prepare peaceful environment for residents and bring the countryside effects of nature into cities through improvement of stream landscape.

Finally, regarding the finding of this study some suggestions and implications are mentioned to improve the quality of the stream.
Ramin Sadeghian,
Volume 21, Issue 1 (6-2010)
Abstract

The Materials Requirements Planning (MRP) method that is applied in production planning and management has some weaknesses. One of its weaknesses is that the time in MRP method is discrete, and is considered as time period. Hence we are not able to order our requirements at irregular time moments or periods. In this paper, a new form of MRP is introduced that is named Continuous Materials Requirements Planning (CMRP) approach. We discuss the disadvantages of Discrete MRP (DMRP) approach and analyze the conditions, applications and the manner of applying CMRP approach in our problems.

Volume 21, Issue 3 (9-2010)
Abstract

  Omni directional mobile robots have been popularly employed in several applications especially in soccer player robots considered in Robocup competitions. However, Omni directional navigation system, Omni-vision system and solenoid kicking mechanism in such mobile robots have not ever been combined. This situation brings the idea of a robot with no head direction into existence, a comprehensive Omni directional mobile robot. Such a robot can respond more quickly and it would be capable for more sophisticated behaviors with multi-sensor data fusion algorithm for global localization base on the data fusion. This paper has tried to focus on the research improvements in the mechanical, electrical and software design of the robots of team ADRO Iran. The main improvements are the world model, the new strategy framework, mechanical structure, Omni-vision sensor for object detection, robot path planning, active ball handling mechanism and the new kicker design, , and other subjects related to mobile robot .


F. Khaksar-Haghani, N. Javadian, R. Tavakkoli-Moghaddam , A. Baboli , R. Kia,
Volume 22, Issue 3 (9-2011)
Abstract

 

  Dynamic cellular manufacturing systems,

  Mixed-integer non-linear programming,

  Production planning, Manufacturing attributes

 

This paper presents a novel mixed-integer non-linear programming model for the design of a dynamic cellular manufacturing system (DCMS) based on production planning (PP) decisions and several manufacturing attributes. Such an integrated DCMS model with an extensive coverage of important design features has not been proposed yet and incorporates several manufacturing attributes including alternative process routings, operation sequence, processing time, production volume of parts, purchasing machine, duplicate machines, machine depot, machine capacity, lot splitting, material flow conservation equations, inflation coefficient, cell workload balancing, budget constraints for cell construction and machine procurement, varying number of formed cells, worker capacity, holding inventories and backorders, outsourcing part-operations, warehouse capacity, and cell reconfiguration. The objective of the integrated model is to minimize the total costs of cell construction, cell unemployment, machine overhead and machine processing, part-operations setup and production, outsourcing, backorders, inventory holding, material handling between system and warehouse, intra-cell and inter-cell movements, purchasing new machines, and machine relocation/installation/uninstallation. A comprehensive numerical example taken from the literature is solved by the Lingo software to illustrate the performance of the proposed model in handling the PP decisions and to investigate the incorporated manufacturing attributes in an integrated DCMS .


Kamyar Sabri Laghaie, Mohammad Saidi Mehrabad, Arash Motaghedi Larijani,
Volume 22, Issue 4 (12-2011)
Abstract

 In this paper a single server queuing production system is considered which is subject to gradual deterioration. The system is discussed under two different deteriorating conditions. A planning horizon is considered and server which is a D/M/1 queuing system is gradually deteriorates through time periods. A maintenance policy is taken into account whereby the server is restored to its initial condition before some distinct periods. This system is modeled to obtain optimal values of arrival rates and also optimal maintenance policy which minimizes production, holding and maintenance costs and tries to satisfy demands through time periods. The model is also considered to control customers’ sojourn times. For each deteriorating condition a model is developed. Models are solved by GA based algorithms and results for a sample are represented .


Seyed Omid Hasanpour Jesri, Abbas Ahmadi, Behrooz Karimi, Mohsen Akbarpour ,
Volume 23, Issue 4 (11-2012)
Abstract

One of the most important issues in urban planning is developing sustainable public transportation. The basic condition for this purpose is analyzing current condition especially based on data. Data mining is a set of new techniques that are beyond statistical data analyzing. Clustering techniques is a subset of it that one of it’s techniques used for analyzing passengers’ trip. The result of this research shows relations and similarities in different segments that its usage is from strategic to tactical and operational areas. The approach in transportation is completely novel in the part of trip patterns and a novel process is proposed that can be implemented in highway analysis. Also this method can be applied in traffic and vehicle treats that need automatic number plate recognition (ANPR) for data gathering. A real case study has been studied here by developed process.
Seyed Mohammad Seyedhosseini, Mohammad Mahdavi Mazdeh, Dr. Ahmad Makui, Seyed Mohammad Ghoreyshi,
Volume 27, Issue 1 (3-2016)
Abstract

In any supply chain, distribution planning of products is of great importance to managers. With effective and flexible distribution planning, mangers can increase the efficiency of time, place, and delivery utility of whole supply chain. In this paper, inventory routing problem (IRP) is applied to distribution planning of perishable products in a supply chain. The studied supply chain is composed of two levels a supplier and customers. Customers’ locations are geographically around the supplier location and their demands are uncertain and follow an independent probability distribution functions. The product has pre-determined fixed life and is to be distributed among customers via a fleet of homogenous vehicles. The supplier uses direct routes for delivering products to customers. The objective is to determine when to deliver to each customer, how much to deliver to them, and how to assign them to vehicle and routes. The mentioned problem is formulated and solved using a stochastic dynamic programming approach. Also, a numerical example is given to illustrate the applicability of proposed approach.


Ali Salmasnia, Hossein Fallah Ghadi, Hadi Mokhtari,
Volume 27, Issue 3 (9-2016)
Abstract

Achieving optimal production cycle time for improving manufacturing processes is one of the common problems in production planning. During recent years, different approaches have been developed for solving this problem, but most of them assume that mean quality characteristic is constant over production run length and sets it on customer’s target value. However, the process mean may drift from an in-control to an out-of-control at a random point in time. This study aims to select the production cycle time and the initial setting of mean quality characteristic, so that the expected total cost, consisting of quality loss and maintenance costs as well as ordering and holding costs, already considered in the classic models is minimized. To investigate the effect of mean process setting, a computational analysis on a real world example is performed. Results show the superiority of the proposed approach compared to the classical economic production quantity model.


Masoud Yaghini, Faeze Ghofrani, Mohammad Karimi, Majedeh Esmi-Zadeh,
Volume 27, Issue 4 (12-2016)
Abstract

The locomotive assignment and the freight train scheduling are important problems in railway transportation. Freight cars are coupled to form a freight rake. The freight rake becomes a train when a locomotive is coupled to it. The locomotive assignment problem assigns locomotives to a set of freight rakes in a way that, with minimum locomotive deadheading time, rake coupling delay and locomotive coupling delay all freight rakes are hauled to their destinations. Scheduling freight trains consists of sequencing and ordering freight trains during the non-usage time between passenger trains but with no interference and with minimum delay times. Solving these two problems simultaneously is of high importance and can be highly effective in decreasing costs for rail transportation. In this paper, we aim to minimize the operational costs for the locomotive assignment and the freight train scheduling by solving these two problems concurrently. To meet this objective, an efficient and effective algorithm based on the ant colony system is proposed. To evaluate the performance of the proposed solution method, twenty-five test problems, which are based on the conditions of Iran Railways, are solved and the computational results are reported.


Arash Khosravi, Seyed Reza Hejazi, Shahab Sadri,
Volume 28, Issue 4 (11-2017)
Abstract

Managing income is a considerable dimension in supply chain management in current economic atmosphere. Real world situation makes it inevitable not to design or redesign supply chain. Redesign will take place as costs increase or new services for customers’ new demands should be provided. Pricing is an important fragment of Supply chain due to two reasons: first, represents revenue based each product and second, based on supply-demand relations enables Supply chain to provide demands by making suitable changes in facilities and their capacities. In this study, Benders decomposition approach used to solve multi-product, multi-echelon and multi-period supply chain network redesign including price-sensitive customers.


Babak Shirazi,
Volume 28, Issue 4 (11-2017)
Abstract

Resource planning in large-scale construction projects has been a complicated management issue requiring mechanisms to facilitate decision making for managers. In the present study, a computer-aided simulation model is developed based on concurrent control of resources and revenue/expenditure. The proposed method responds to the demand of resource management and scheduling in shell material embankment activities regarding large-scale dam projects of Iran. The model develops a methodology for concurrent management of resources and revenue/expenditure estimation of dam's projects. This real-time control allows managers to simulate several scenarios and adopt the capability of complicated working policies. Results validation shows that the proposed model will assist project managers as a decision support tool in cost-efficient executive policymaking on resource configuration.
 
Mojtaba Hamid, Mahdi Hamid, Mohammad Mahdi Nasiri, Mahdi Ebrahimnia,
Volume 29, Issue 2 (6-2018)
Abstract

Surgical theater is one of the most expensive hospital sources that a high percentage of hospital admissions are related to it. Therefore, efficient planning and scheduling of the operating rooms (ORs) is necessary to improve the efficiency of any healthcare system. Therefore, in this paper, the weekly OR planning and scheduling problem is addressed to minimize the waiting time of elective patients, overutilization and underutilization costs of ORs and the total completion time of surgeries. We take into account the available hours of ORs and the surgeons, legal constraints and job qualification of surgeons, and priority of patients in the model. A real-life example is provided to demonstrate the effectiveness and applicability of the model and is solved using ε-constraint method in GAMS software. Then, data envelopment analysis (DEA) is employed to obtain the best solution among the Pareto solutions obtained by ε-constraint method. Finally, the best Pareto solution is compared to the schedule used in the hospitals. The results indicate the best Pareto solution outperforms the schedule offered by the OR director.
Rana Imannezhad, Soroush Avakh Darestani,
Volume 29, Issue 3 (9-2018)
Abstract

Project scheduling problem with resources constraint is a well-known problem in the field of project management. The applicable nature of this problem has caused the researchers’ tendency to it. In this study, project scheduling with resource constraints and the possibility of interruption of project activities as well as renewable resources constraint has been also applied along with a case study on construction projects. Construction projects involve complex levels of work. Making wrong decisions in selecting methods and how to allocate the necessary resources such as manpower and equipment can lead to the results such as increasing the predetermined cost and time. According to NP-Hard nature of the problem, it is very difficult or even impossible to obtain optimal solution using optimization software and traditional methods. In project scheduling using CPM method, critical path is widely used; however, in this method, the resource constraints is not considered. Project Scheduling seek proper sequence for doing the project activities. This study has been conducted using Bees meta-heuristic algorithm, with the aim of optimizing the project completion time. Finally, the results obtained from three algorithms and GAMS software shows that this algorithm has better performance than and the solution among the other algorithms and has achieved the accurate solutions.
 
[1] Critical Path Method

Fatemeh Bayatloo, Ali Bozorgi-Amiri,
Volume 29, Issue 4 (12-2018)
Abstract

Development of every society is incumbent upon energy sector’s technological and economic effectiveness. The electricity industry is a growing and needs to have a better performance to effectively cover the demand. The industry requires a balance between cost and efficiency through careful design and planning. In this paper, a two-stage stochastic programming model is presented for the design of electricity supply chain networks. The proposed network consists of power stations, transmission lines, substations, and demand points. While minimizing costs and maximizing effectiveness of the grid, this paper seeks to determine time and location of establishing new facilities as well as capacity planning for facilities. We use chance constraint method to satisfy the uncertain demand with high probability. The proposed model is validated by a case study on Southern Khorasan Province’s power grid network, the computational results show that the reliability rate is a crucial factor which greatly effects costs and demand coverage. 
Goortani Elahe Mohagheghian, Fakhrzad Bagher Fakhrzad,
Volume 30, Issue 1 (3-2019)
Abstract

Supply chain members coordinate with each other in order to obtain more profit. The major mechanisms for coordination among supply chain echelons are pricing, inventory management, and ordering decisions. This paper concerns these mechanisms in a multi-echelon supply chain consisting of multiple suppliers, one manufacturer, and multiple retailers in order to study the price and leadtime competition, where the make-to-order production mode is employed and consumers are sensitive to retail price and leadtime. In the current study, a novel inventory model is presented, where the manufacturer has an exclusive supplier for every required component of its final product. The interactions and decisions of the firms are observed in multiple time periods. Moreover, each supply chain member has equal power and make their decisions simultaneously. The proposed model considers the relationships among three echelon supply chain members based on a non-cooperative Nash game with pricing and inventory decisions. An iterative solution algorithm is proposed to find Nash equilibrium point of the game. Several numerical examples are presented to study the application of the model as well as the effectiveness of the algorithm. Finally, a comprehensive sensitivity analysis is performed and some important managerial insights are highlighted.
 
Saeed Dehnavi, Ahmad Sadegheih,
Volume 31, Issue 1 (3-2020)
Abstract

In this paper, an integrated mathematical model of the dynamic cell formation and production planning, considering the pricing and advertising decision is proposed. This paper puts emphasis on the effect of demand aspects (e.g., pricing and advertising decisions) along with the supply aspects (e.g., reconfiguration, inventory, backorder and outsourcing decisions) in developed model. Due to imprecise and fuzzy nature of input data such as unit costs, capacities and processing times in practice, a fuzzy multi-objective programming model is proposed to determine the optimal demand and supply variables simultaneously. For this purpose, a fuzzy goal programming method is used to solve the equivalent defuzzified multi-objective model. The objective functions are to maximize the total profit for firm and maximize the utilization rate of machine capacity. The proposed model and solution method is verified by a numerical example.
Hadi Mokhtari, Aliakbar Hasani, Ali Fallahi,
Volume 32, Issue 2 (6-2021)
Abstract

One of the basic assumptions of classical production-inventory models is that all products are of perfect quality. However, in real manufacturing situations, the production of defective items is inevitable, and a fraction of the items produced may be naturally imperfect. In fact, items may be damaged due to production and/or transportation conditions in the manufacturing process. On the other hand, some reworkable items exist among imperfect items that can be made perfect by additional processing. In addition, the classical production-inventory models assume that there is only one product in the system and that there is an unlimited amount of resources. However, in many practical situations, several products are produced and there are some constraints related to various factors such as machine capacity, storage space, available budget, number of allowable setups, etc. Therefore, we propose new constrained production-inventory models for multiple products where the manufacturing process is defective and produces a fraction of imperfect items. A percentage of defective items can be reworked, and these products go through the rework process to become perfect and return to the consumption cycle. The goal is to determine economic production quantities to minimize the total cost of the system. The analytical solutions are each derived separately by Lagrangian relaxation method, and a numerical example is presented to illustrate and discuss the procedure. A sensitivity analysis is performed to investigate how the variation in the inputs of the models affects the total cost of the inventory system. Finally, some research directions for future works are discussed.
Reza Ramezanian, Soleiman Jani,
Volume 32, Issue 3 (9-2021)
Abstract

In this paper, a fuzzy multi-objective optimization model in the logistics of relief chain for response phase planning is addressed. The objectives of the model are: minimizing the costs, minimizing unresponsive demand, and maximizing the level of distribution and fair relief. A multi-objective integer programming model is developed to formulate the problem in fuzzy conditions and transformed to the deterministic model using Jime'nez approach. To solve the exact multi-objective model, the ε-constraint method is used. The resolved results for this method have shown that this method is only able to find the solution for problems with very small sizes. Therefore, in order to solve the problems with medium and large sizes, multi-objective cuckoo search optimization algorithm (MOCSOA) is implemented and its results are compared with the NSGA-II. The results showed that MOCSOA in all cases has the higher ability to produce higher quality and higher-dispersion solutions than NSGA-II.
 
Vahid Razmjoei, Iraj Mahdavi, Nezam Mahdavi-Amiri, Mohammad Mahdi Paydar,
Volume 33, Issue 2 (6-2022)
Abstract

Companies and firms, nowadays, due to mounting competition and product diversity, seek to apply virtual cellular manufacturing systems to reduce production costs and improve quality of the products. In addition, as a result of rapid advancement of technology and the reduction of product life cycle, production systems have turned towards dynamic production environments. Dynamic cellular manufacturing environments examine multi-period planning horizon, with changing demands for the periods. A dynamic virtual cellular manufacturing system is a new production approach to help manufacturers for decision making. Here, due to variability of demand rates in different periods, which turns to flow variability, a mathematical model is presented for dynamic production planning. In this model, we consider virtual cell production conditions and worker flexibility, so that a proper relationship between capital and production parameters (part-machine-worker) is determined by the minimum lost sales of products to customers, a minimal inventory cost, along with a minimal material handling cost. The problems based on the proposed model are solved using LINGO, as well as an epsilon constraint algorithm.

Page 1 from 2    
First
Previous
1