دوره 4، شماره 4 - ( 8-1393 )                   جلد 4 شماره 4 صفحات 508-491 | برگشت به فهرست نسخه ها

XML English Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Meskó D. OPTIMALIZATION PHASE USING GRAPH MODELLING FOR RELIABLE BUILDING COMPLEXES. International Journal of Optimization in Civil Engineering 2014; 4 (4) :491-508
URL: http://ijoce.iust.ac.ir/article-1-189-fa.html
OPTIMALIZATION PHASE USING GRAPH MODELLING FOR RELIABLE BUILDING COMPLEXES. عنوان نشریه. 1393; 4 (4) :491-508

URL: http://ijoce.iust.ac.ir/article-1-189-fa.html


چکیده:   (14895 مشاهده)
During the planning phase of modern, complex, block-structured, large-area located, but still landscape-harmonized health-care buildings, the key is the optimal positioning of the blocks and functions, simultaneously ensuring the most-effective backup-paths for any transportation route failure in the buildings in order to speed up system operation, reduce maintenance costs and especially to improve patient safety and satisfaction. The importance of improving reliability and boundary conditions of the modelling in modern complex health-care building-systems are emphasized. A cost efficient pre-phase solution of mathematical, graph modelling is presented, with introducing link doubling to linearize a two segment, non-linear capacity-cost function. The developed and detailed mathematical graph model can be used as part of the architectural planning workflow. This model allows distinguishing the sharable part from the free part of capacity on a link in case of simultaneously routing multiple protection paths. Link doubling allows finding optimal routing of shared protection paths for failure cases. Two algorithms are proposed for routing of the guaranteed bandwidth pipes with shared protection which provides reliable building structures through thrifty additional resources. It is assumed that a single working path can be protected by one or multiple protection paths, which are partially or fully disjoint from the working one. This approach allows better capacity sharing among protection paths. The main aim of the recommendations is to achieve a reliable, fully operational building even if a failure, a reconditioning or emergency situation happens.
متن کامل [PDF 901 kb]   (4816 دریافت)    
نوع مطالعه: پژوهشي | موضوع مقاله: Optimal design
دریافت: 1393/8/27 | پذیرش: 1393/8/27 | انتشار: 1393/8/27

ارسال نظر درباره این مقاله : نام کاربری یا پست الکترونیک شما:
CAPTCHA

بازنشر اطلاعات
Creative Commons License این مقاله تحت شرایط Creative Commons Attribution-NonCommercial 4.0 International License قابل بازنشر است.

کلیه حقوق این وب سایت متعلق به دانشگاه علم و صنعت ایران می باشد.

طراحی و برنامه نویسی : یکتاوب افزار شرق

© 2024 CC BY-NC 4.0 | Iran University of Science & Technology

Designed & Developed by : Yektaweb