دوره 3، شماره 4 - ( 7-1392 )                   جلد 3 شماره 4 صفحات 616-601 | برگشت به فهرست نسخه ها

XML English Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Khanzadi M, Dabirian K Z, Ghazvini K Z. DEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY. International Journal of Optimization in Civil Engineering 2013; 3 (4) :601-616
URL: http://ijoce.iust.ac.ir/article-1-152-fa.html
DEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY. عنوان نشریه. 1392; 3 (4) :601-616

URL: http://ijoce.iust.ac.ir/article-1-152-fa.html


چکیده:   (16705 مشاهده)
Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the highway activities is a good reason for schedulers to use linear scheduling methods in order to estimate the time of the project. One of the most important factors in linear projects is considering the effect of the activities productivity on scheduling. The first part of the research has been proposed to quantify the main equation of the identified factors for predicting the daily production rates of the embankment activity. The second part is scheduling the highway construction projects by developing the LSMvpr method based on the application of the embankment activity productivity equation. The purpose of the research is to develop the LSMvpr method for scheduling the highway construction projects by considering the concept of activity productivity in the shape of an equation varying by independent variables changes. By the use of multiple regression analysis the coefficients of affecting factors have been calculated in order to gain a production rate equation for predicting the embankment activity productivity. A software package has been presented for scheduling a highway construction project by coding in MATLAB. The offered software used for validating the model for scheduling the highway construction projects.
متن کامل [PDF 293 kb]   (6041 دریافت)    
نوع مطالعه: پژوهشي | موضوع مقاله: Optimal design
دریافت: 1392/8/28 | پذیرش: 1392/8/28 | انتشار: 1392/8/28

ارسال نظر درباره این مقاله : نام کاربری یا پست الکترونیک شما:
CAPTCHA

بازنشر اطلاعات
Creative Commons License این مقاله تحت شرایط Creative Commons Attribution-NonCommercial 4.0 International License قابل بازنشر است.

کلیه حقوق این وب سایت متعلق به دانشگاه علم و صنعت ایران می باشد.

طراحی و برنامه نویسی : یکتاوب افزار شرق

© 2024 CC BY-NC 4.0 | Iran University of Science & Technology

Designed & Developed by : Yektaweb