Back to IUST Research Laboratories Network
Main Menu
Masonry arch bridges::
Steel bridges::
SHM of switches::
Contact us::
::
Search in website

Advanced Search
..
:: Project overview ::

Chief researcher: Dr.Sadegh Marefat (University of Tehran)

Consulting by IMIRL

Bridge on Km 23+000 is a two-span old masonry arch bridge in Iranian railway network. The bridge has been loaded to find out the maximum loading capacity of the bridge. The bridge was instrumented with 7 deflection meters. The bridge managed to withstand a static load of 728 tons. The bridge demonstrated relatively stiff and strong response, despoite initiation of enormous cracks, and it yielded under load levels much greater than the service load.

AWT IMAGE

View: 1262 Time(s)   |   Print: 459 Time(s)   |   Email: 0 Time(s)   |   0 Comment(s)
>
Click here to see all texts in Km 023+000 topic.
Persian site map - English site map - Created in 0.15 seconds with 45 queries by YEKTAWEB 4665